Port of Sokhna container terminal basin 2 dredging, reclamation and offshore port.
- Client: DP World
- Consultant: Jacobs and pacer engineering
- Main contractor: CHEC China Harbour Engineering Co. Egypt.LTD
- In this project we played a vital role in field : renting equipment, transportation and supplying experienced labor and specialists.
-
- Supplying Mobile cranes till 70 ton
- Supplying Crawler cranes till 200 ton
- Supplying Excavators till 400 ton (225 Caterpillar, 300 & 400 Doosan and Komatsu)
- Supplying Dump Trucks for removing rubbles and soil
- Supplying Loader 36, 66 and 72
- Supplying Rollers (Interlock), Graders, Man Lift
- Supplying Water Tank, Diesel Tank & Bed-flat Trailer 12 mt & 36mt telescopic
- Supplying Air compressor & Clarks
- Supplying Rubbles with different sizes from 20 to 100.
- Supplying Marine equipment :
- Barge for sludge removal in order garbage and oil removing
- Tug boat
- Service boat