Port of Sokhna container terminal basin

Port of Sokhna container terminal basin 2 dredging, reclamation and offshore port.

  • Client: DP World
  • Consultant: Jacobs and pacer engineering
  • Main contractor: CHEC China Harbour Engineering Co. Egypt.LTD
  • In this project we played a vital role in field : renting equipment, transportation and supplying experienced labor and specialists.

 

    • Supplying Mobile cranes till 70 ton
    • Supplying Crawler cranes till 200 ton
    • Supplying Excavators till 400 ton (225 Caterpillar, 300 & 400 Doosan and Komatsu)
    • Supplying Dump Trucks for removing rubbles and soil
    • Supplying Loader 36, 66 and 72
    • Supplying Rollers (Interlock), Graders, Man Lift
    • Supplying Water Tank, Diesel Tank & Bed-flat Trailer 12 mt & 36mt telescopic
    • Supplying Air compressor & Clarks
    • Supplying Rubbles with different sizes from 20 to 100.
    • Supplying Marine equipment :
      • Barge for sludge removal in order garbage and oil removing
      • Tug boat
      • Service boat